Early satellite failures significantly degrading satellite operations are reviewed with emphasis on LANDSAT D, the Technology Demonstration Satellite, the ATREX/AEM spacecraft, STORMSAT 2, and the synchronous meteorological satellite. Candidates for correction with on-orbit checkout and appropriate actions are analyzed. On-orbit checkout subsystem level studies are summarized for electrical power, attitude control, thermal control, reaction control and propulsion, instruments, and angular rate matching for alignment of satellite IRU.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    On-Orbit Checkout of Satellites, Volume 2. Part 3 of on-Orbit Checkout Study


    Beteiligte:

    Erscheinungsdatum :

    1978


    Format / Umfang :

    142 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    On-Orbit Checkout Study

    E. I. Pritchard | NTIS | 1977


    On-orbit checkout study

    Pritchard, E. I. | NTRS | 1977