The project proposes the construction for a new dam and spillway located close to the existing Melones Dam. Access roads, resident engineer facilities, downstream public overlook and safety scaling of the damsite have been completed. Additional project related work will include road and utility relocations, powerhouse, switchyard, surge tank, reservoir clearing and initial recreation facility construction. A number of caves and archeological sites will be inundated. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    New Melones Lake, Stanislaus River, California


    Erscheinungsdatum :

    1972


    Format / Umfang :

    120 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Fixed-Cone Valve Prototype Tests, New Melones Dam, California

    Fagerburg, Timothy L. / United States. Army. Corps of Engineers. Sacramento District. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1983

    Freier Zugriff

    Fixed-Cone Valves, New Melones Dam, California: Hydraulic Model Investigation

    Maynord, Stephen T. / Grace, John L. Jr. / United States. Army. Corps of Engineers. Sacramento District. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1981

    Freier Zugriff


    Flood Control and Irrigation Outlet Works and Tailrace Channel for New Melones Dam, Stanislaus River, California: Hydraulic Model Investigation

    Maynord, Stephen T. / United States. Army. Corps of Engineers. Sacramento District. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1981

    Freier Zugriff