A summary of the findings for the implementation of improvements to traffic operations and the design of surveillance and control system in New Jersey Route 3 is presented in this volume. This project was one of five conducted in the Manhattan CBD - North Jersey Corridor under the Urban Corridor Demonstration Program. This volume is the first in a five-volume set covering the traffic demonstration studies and surveillance and control design for the New Jersey Route 3 Urban Corridor Demonstration Program: Volume I. New Jersey Route 3 Urban Corridor - Summary; Volume II. New Jersey Route 3 Traffic Demonstrations; Volume III. New Jersey Route 3 Traffic Surveillance & Control - Design; Volume IV. New Jersey Route 3 Traffic Surveillance & Control - Hardware Specifications; Volume V. New Jersey Route 3 Traffic Surveillance & Control - Software Specifications.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Urban Corridor Demonstration Program Manhattan CBD-North Jersey Corridor, New Jersey Route 3 Corridor Study--Summary. Volume I


    Erscheinungsdatum :

    1975


    Format / Umfang :

    37 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch