A plan of improvement is recommended to reduce the size of storm waves entering the harbor by a 70-foot extension to the south breakwater and a 327-foot arm added to the north breakwater. The harbor improvement will benefit locally-based and transient recreational craft by providing increased protection from damaging storm waves to the inner harbor. The proposed action will cause a temporary increase in turbidity, noise, and vessel traffic during construction. Fish in the vicinity of the construction will be temporarily displaced. Lake bottom area will be lost as the extensions are built.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Breakwater Extensions at Port Sanilac Harbor, Michigan


    Erscheinungsdatum :

    1972


    Format / Umfang :

    37 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch