This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test.
Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer
1994
23 pages
Report
Keine Angabe
Englisch
Radiation Pollution & Control , Radiation Shielding, Protection, & Safety , Radioactive Wastes & Radioactivity , Industrial & Mechanical Engineering , Hanford Reservation , Materials Handling Equipment , Pumps , Storage Facilities , Radioactive waste storage , Materials Handling , Performance Testing , Tanks , EDB/052002