The technical progress achieved during the period 2 October through 29 October, 1995 is described herein. This report is organized by program task structure: (1) spacecraft integration and liaison; (2) engineering support; (3) safety; (4) qualified unicouple production; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and GACO maintenance and repair; and CAGO acquisition (capital funds).