Cost estimates and funding schedules are presented for a given configuration and costing ground rules. Cost methodology is described and the cost evolution from a baseline configuration to a selected configuration is given, emphasizing cases in which cost was a design driver. Programmatic cost avoidance techniques are discussed.
Modular space station phase B extension program cost and schedules. Volume 1: Cost and schedule estimating process and results
01.01.1972
Report
Keine Angabe
Englisch