High-bypass turbofan engines with features required for commercial short haul powered lift transports were designed. Two engines were configured for each of the externally blown flap installations, under-the-wing and over-the-wing. Estimates of installed and uninstalled performance, noise, and weight were defined for each propulsion system.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    QCSEE task 2: Engine and installation preliminary design


    Beteiligte:
    Neitzel, R. E. (Autor:in) / Lee, R. (Autor:in) / Chamay, A. J. (Autor:in)

    Erscheinungsdatum :

    01.06.1973


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Preliminary QCSEE program test results

    Ciepluch, C.C. | Tema Archiv | 1977


    Preliminary QCSEE Program Test Results

    Ciepluch, Carl C. | SAE Technical Papers | 1977


    Preliminary QCSEE program - Test results

    Ciepluch, C. C. | NTRS | 1977


    Preliminary QCSEE program test results

    Ciepluch, C. C. | NTRS | 1977