This Master Test Plan outlines the test program to be performed by Hamilton Standard during the Urine Water Recovery Subsystem Program. Testing is divided into three phases: (1) design support testing; development component testing; and acceptance testing. The completion of this test program verifies the subsystem operation.
Development of a preprototype times wastewater recovery subsystem: Appendices
01.07.1984
Report
Keine Angabe
Englisch