This timeline was generated on the Integrated Mission Program (IMP). All burn events over 2 seconds are finite with IMP solving a two point boundary value setup for begin burn time, burn time and control angles. Perigee and apogee shown above are mean orbital values. Significant events are listed. Each finite thrust event has two lines. The first is the beginning time showing the initial conditions, thrust and ISP used. The second has the end burn conditions and the delta v and time of burn. This case is an abort from the 750 x 750 phasing abort, using the taxi's main engines. An abort using the Reaction Control System (RCS) was also investigated but required a large increase in RCS propellant and was abandoned.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Human Mars Mission Performance Crew Taxi Profile


    Beteiligte:

    Erscheinungsdatum :

    07.10.1999


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch


    Schlagwörter :





    Manned MARS Mission Crew Factors

    P. A. Santy | NTIS | 1986


    Manned Mars mission crew factors

    Santy, Patricia A. | NTRS | 1986