A video presentation on an update of the STS-1 Columbia Shuttle is shown. Hugh Harris is the moderator. He introduces Don Phillips, Chief STS Test OPS, who presents the status of the vehicle. Terry William, Chief of Mechanical Systems, discusses the debonding of the panels. A question and answer period from the news media is shown. The various topics of discussion from the news media include: 1) Repair of thermal tiles; 2) Launch dates; and 3) Landing and launch sites and 4) Low pressure/high pressure tanking tests. An audio presentation is given of questions from NASA Marshall Space Flight Center and NASA Washington. On March 12, 1981, another STS-1 Columbia update is shown. Bob Schick, Shuttle Test Director, and Bob Sieck, Flight Project Engineer answers questions about the actual repair time of the panels and a very detailed description of the three areas of debonding is presented. A brief launch date statement from Dr. Allen Lovelace, Acting NASA Administrator is given and John Lardley, Shuttle Associate Director, discusses the flight readiness review.


    Zugriff

    Zugriff über TIB


    Exportieren, teilen und zitieren



    Titel :

    STS-1: Columbia Briefings


    Erscheinungsdatum :

    01.01.2006


    Medientyp :

    Audiovisuelles Material


    Format :

    Keine Angabe


    Sprache :

    Englisch







    Departure, Takeoff and Approach Briefings

    Wiley, J. | British Library Online Contents | 2000


    US Army Aviation Program Briefings

    Barrie, R. | British Library Conference Proceedings | 2019