The Flight IPT assessed the reasonableness of demonstrating each of the Access 5 Step 1 functional requirements. The functional requirements listed in this matrix are from the September 2005 release of the Access 5 Functional Requirements Document. The demonstration mission considered was a notional Western US mission (WUS). The conclusion of the assessment is that 90% of the Access 5 Step 1 functional requirements can be demonstrated using the notional Western US mission.
Airspace Operations Demo Functional Requirements Matrix
01.09.2005
Sonstige
Keine Angabe
Englisch
NTIS | 2023
|NTIS | 2022
|NTRS
|NTRS
|