Railway operators usually do not consider the limit of the electrical energy supply in Japan. Although technologies have been developed for energy efficiency, the limit on the available electrical energy is not considered. However, railway operators met the limit in summer 2011 after the earthquake off the Pacific coast of Tohoku. In this study, we develop an electrical energy allotment method for a large railway network. The method optimizes train operations to provide better railway service when the energy supply is limited. We also develop a search method to find the optimal operation from very large combinations of operation factors. These optimization and search methods are evaluated using the Tohoku earthquake scenario.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    An Electrical Energy Allotment Method for a Large Railway Network



    Erschienen in:

    Erscheinungsdatum :

    2016




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch



    Klassifikation :

    Lokalklassifikation TIB:    770/5600/8000
    BKL:    53.00 Elektrotechnik: Allgemeines / 52.53 / 53.00 / 53.33 / 53.31 / 53.33 Elektrische Maschinen und Antriebe / 53.31 Elektrische Energieübertragung / 52.53 Kraftwerkstechnik



    Budget or allotment of railway purchases

    Curtis, D.C. | Engineering Index Backfile | 1928


    Allotment booking in intermodal transport

    Ilona Jaržemskienė / Vytautas Jaržemskis | DOAJ | 2009

    Freier Zugriff

    Allotment booking in intermodal transport

    I. Jaržemskienė / V. Jaržemskis | DOAJ | 2009

    Freier Zugriff

    Principles governing the allotment of new rail

    Engineering Index Backfile | 1916


    Warship spare parts allotment optimization method under mixed-constraints

    Cai, Zhiming / Jin, Jiashan / Chen, Yanqiao | British Library Online Contents | 2015