This document has been reaffirmed to comply with the SAE 5-year Review policy. REFER TO ARP 244 FOR FLANGE INSTALLATION CLEARANCE. OUTLINE SHOWN COVERS BASIC PROPELLER CONTROL PARTS ONLY. ADDITIONAL CLEARANCE AND ACCESS MUST BE PROVIDED FOR ELECTRICAL, MECHANICAL AND HYDRAULIC CONNECTIONS REQUIRED BY DETAIL PROPELLER EQUIPMENT SPECIFIED. DIMENSIONS SHOWN REPRESENT MAXIMUM ENVELOPE OF PROPELLER PARTS AS DEFINED ABOVE. THIS ENVELOPE APPLIES TO CONTROLS FOR USE ON REDUCTION GEAR SECTIONS DESIGNED AFTER DATE OF ISSUE.
Propeller Control Clearance - Single Acting System Single Rotation Propeller Shaft Reciprocating Engines
11.05.2006
Aufsatz (Konferenz)
Englisch