The unprecedented size of the Mangla Dam Project has lead to the selection, operation, and maintenance of the largest peacetime construction fleet ever assembled. Equipment selection was carefully made, native operators trained and modern production techniques practiced. Resultant mechanical problems were resolved and routine repairs were accomplished by an energetic maintenance program, thus satisfactory results have been achieved by combining American construction industry know-how with good construction machinery and vendor service.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Equipment Selection, Operation and Maintenance at Mangla Dam


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:

    Kongress:

    18th Annual Earthmoving Industry Conference ; 1967



    Erscheinungsdatum :

    01.02.1967




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Impacts of land use change on the sedimentation of the mangla reservoir, Pakistan

    Hussain, I. / Cattapan, A. / Franca, J. et al. | HENRY – Bundesanstalt für Wasserbau (BAW) | 2018

    Freier Zugriff

    Impacts of land use change on the sedimentation of the mangla reservoir, Pakistan

    Hussain, I. / Cattapan, A. / Franca, J. | BASE | 2018

    Freier Zugriff


    Sustainable Reservoir Management Approaches under Impacts of Climate Change - A Case Study of Mangla Reservoir, Pakistan

    Khan, Muhammad Adnan / Technische Universität Dresden | TIBKAT | 2023

    Freier Zugriff

    Substation operation and maintenance operation equipment

    WANG GUISHAN / HAO ZHIJIE / LU WENXING et al. | Europäisches Patentamt | 2023

    Freier Zugriff