This test plan consists of two major sections for the production testing of bus controllers: Electrical tests and Protocol tests. This document has been determined to contain basic and stable technology which is not dynamic in nature.
Production Test Plan for the Time Division Command/Response Multiplex Data Bus Bus Controllers
14.08.2017
Aufsatz (Konferenz)
Englisch