Eastern’s new plating shop has an uncluttered overhead in the tank areas, all plating lines are in one room, and second floor plating areas are above full access pit areas. The shop has down-draft ventilation, more than one hundred tanks 3 feet × 5 feet and larger, and was built into an existing structure. This was accomplished in a cost effective design which was constructed on time and within budget and which provides a shop that is easy to maintain, monitor, and modify. Special attention was given to meeting environmental regulations.
Design of the Eastern Air Lines Plating Shop
Sae Technical Papers
Annual Aerospace/Airline Plating and Metal Finishing Forum and Exposition ; 1982
01.02.1982
Aufsatz (Konferenz)
Englisch
Plating Shop Personnel Personal Protective Equipment
SAE Technical Papers | 1990
|Electrodeless Conductivity Instruments in the Plating Shop
SAE Technical Papers | 1991
|Maintenance shop organization for city lines
Engineering Index Backfile | 1912
|Engineering Index Backfile | 1959
SAE Technical Papers | 1930
|