A series of tests has been conducted at the NASA Marshall Space Flight Center (MSFC) to evaluate the performance of a Space Station Freedom (SSF) pre-development water recovery system. Potable, hygiene, and urine reclamation subsystems were integrated with end-use equipment items and successfully operated for a total of 35 days, including 23 days in closed-loop mode with man-in-the-loop. Although several significant subsystem physical anomalies were encountered, reclaimed potable and hygiene water routinely met current SSF water quality specifications. This paper summarizes the test objectives, system design, test activities/protocols, significant results/anomalies, and major lessons learned.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Phase III Integrated Water Recovery Testing at MSFC: Closed Hygiene and Potable Loop Test Results and Lesson Learned


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:

    Kongress:

    International Conference On Environmental Systems ; 1992



    Erscheinungsdatum :

    01.07.1992




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch






    Phase III Integrated Water Recovery Testing at MSFC: Single Loop Test Results and Lessons Learned

    Carter, Donald Layne / Bagdigian, Robert M. | SAE Technical Papers | 1993


    Phase III Integrated Water Recovery Testing at MSFC: International Space Station Configuration Test Results and Lessons Learned

    Holder, D. W. / Carter, D. L. / Hutchens, C. F. et al. | British Library Conference Proceedings | 1995


    Phase III Integrated Water Recovery Testing at MSFC: International Space Station Configuration Test Results and Lessons Learned

    Hutchens, Cindy F. / Carter, D. Layne / Holder, Donald W. | SAE Technical Papers | 1995