Abstract To improve the scheduling efficiency in the Pubugou Hydropower Project, this paper studies the practical resource-constrained project scheduling problem with multi-mode (MRCPSP) in its Construction and Decoration Systems. By taking into account the roughness and randomness in the hybrid uncertain environment, a rough random Multiple Objective Decision Making (MODM) model is presented. To deal with the complex uncertainties, the rough random expected value model is used to obtain an equivalent crisp model. Subsequently, motivated by the particular nature of MODM model, Multiple Objective Particle Swarm Optimization (MOPSO) algorithm is employed to search the Pareto optimal solutions. An practical application to Construction and Decoration Systems in Pubugou Hydropower Project is presented to verify the practicability of the proposed rough random MODM model and the efficiency of the solution algorithm.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Applying rough random MODM model to resource-constrained project scheduling problem: A case study of Pubugou Hydropower Project in China


    Beteiligte:
    Zhang, Zhe (Autor:in) / Xu, Jiuping (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    20.05.2014


    Format / Umfang :

    13 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch





    Applying bi-random MODM model to navigation coordinated scheduling: a case study of Three Gorges Project

    Xu, Jiuping / Zhang, Zhe / Mookerjee, Vijay S. | British Library Online Contents | 2013


    Applying bi-random MODM model to navigation coordinated scheduling: a case study of Three Gorges Project

    Xu, J. / Zhang, Z. / Mookerjee, V.S. | British Library Online Contents | 2013


    Resource-Constrained Project Scheduling and Timetabling

    Brucker, P. / Knust, S. | British Library Conference Proceedings | 2000


    Chaotic differential evolution algorithm for resource constrained project scheduling problem

    Chen, Weiming / Ni, Xiaoyang | British Library Online Contents | 2014