Abstract The ground support system has a significant impact on tunnel safety while the installation time of initial support is commonly designed by empirical method. The three dimensional numerical model, based on the engineering practice, is analyzed by FLAC3D. In this paper, an improved LDP (longitudinal displacement profile) equation is proposed, which is more accurate in describing the convergence of tunnel before excavation face reaching. Then, a methodology is presented to determine the installation location of initial support in a more efficient and effective way. By simulating the process of excavation load releasing, the appropriate time for installing initial support is when the evolution of surrounding rock displacement has a tendency to increase rapidly, namely that the stability of rock mass arrives at the critical state. The mathematical relationship between the convergence of tunnel and the relative location to tunnel face can be established by fitting monitoring data with the improved LDP equation. Substituting the critical tunnel convergence into the LDP relationship, the corresponding installation location of initial support will be calculated. Meanwhile, several schemes with diverse geological conditions are carried out to validate the improved LDP and the methodology.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Improved Longitudinal Displacement Profile and Initial Support for Tunnel Excavation


    Beteiligte:
    Zhang, Yan-Jun (Autor:in) / Su, Kai (Autor:in) / Qian, Zhong-Dong (Autor:in) / Wu, He-Gao (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    30.04.2019


    Format / Umfang :

    10 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Improved Longitudinal Displacement Profile and Initial Support for Tunnel Excavation

    Zhang, Yan-Jun / Su, Kai / Qian, Zhong-Dong et al. | Online Contents | 2019




    Crawler-type tunnel excavation trolley

    LIU JINKUI / GUO SHUCHUN / CAO YUMIN et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Installation Time of Ground Support during Tunnel Excavation: A Novel Graph Methodology

    Su, Kai / Zhang, Yan-Jun / Cui, Jin-Peng et al. | Springer Verlag | 2020