A scheduling problem arising in factories producing large building blocks is modelled applying optimization techniques. The application is a shipyard workshop producing prefabricated keel elements. The objective is to maximize the number of building blocks produced in the factory during a certain time window. The solution combines a Guided Local Search heuristic with Fast Local Search techniques. A final discussion explains the additional real-life issues arising in the industrial application and how firm-specific constraints can be conveniently considered by the model.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Optimization of Surface Utilization Using Heuristic Approaches



    Erschienen in:

    Ship Technology Research ; 52 , 3 ; 141-147


    Erscheinungsdatum :

    01.07.2005


    Format / Umfang :

    7 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Optimization of surface utilization using heuristic approaches

    Langer, Yves / Bay, Maud / Crama, Yves et al. | Tema Archiv | 2005



    EGR Cooler Performance Monitor - Heuristic Approaches Using Temperature Measurement

    Yoo, In Kwang / Van Nieuwstadt, Michiel / Kim, Yong-Wha | SAE Technical Papers | 2011


    Ship Design Using Heuristic Optimization Methods

    Wolf, Robert / Dickman, John / Boas, Ryan | AIAA | 2005


    Global Optimization Using Bayesian Heuristic Approach

    Lin, S. / Tian, F. / Lu, Y. | British Library Conference Proceedings | 2000