Cost considerations have been a major factor in the developments which have taken place in br's 50 hz a.C. Electrification since 1960. the first efforts towards cost reduction were diredted towards the more economical application of established techniques and included the elimination of brick buildings to house ancillary equipment and the use of switchgear in a steel housing with bare overhead connections to the contact system.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Development of power supply and supervisory equipment for british railways 50 hz a.C. Electrification


    Beteiligte:
    Cole, A.H. (Autor:in) / Roper, H. (Autor:in) / Whittaker, F. (Autor:in)

    Erschienen in:

    Proceedings of the IEE Power ; 119 , 2 ; 189-199


    Erscheinungsdatum :

    1972


    Format / Umfang :

    11 Seiten, 11 Bilder, 2 Tabellen, 4 Quellen


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    British railways electrification

    Engineering Index Backfile | 1922


    Electrification of British railways

    Engineering Index Backfile | 1913


    British railways electrification conference

    Engineering Index Backfile | 1960


    The electrification of British railways

    Engineering Index Backfile | 1903


    The electrification of British railways

    Bridge, Albert H. | Engineering Index Backfile | 1920