The settlement of ground and vault by tunneling has important effect on construction safety and normal operation of urban transport system. The soils around reserved shaft of Beiwan region in No.1 section of Beijing Metro Line No.7 are backfilled and complex. In order to tunnel safely and keep surrounding structures safe, the stability of rectangular transition section by tunneling of Beiwan horsehead region is analyzed. Based on the data of surface survey, drilling, prediction detection of the strata and engineering design, the software of 3D FLAC is used to study the vault and ground settlements during the excavation of six pilot tunnels of rectangular transition section, and the results are also compared with the results of in-situ monitoring. The research shows that the results of numerical simulation and in-situ monitoring are matched very well, the ultimate ground settlement will be 17 mm when the transition tunnel is excavated by non-shrinkage (WSS) pre-grouting method and CRD method, and meets with the requirements of standard specification. Therefore, the six-pilot-tunneling method is good for keeping the transition tunnel stable.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Stability Analysis on Rectangular Transition Section Tunneling in Beiwan Horsehead Region of No. 7 Subway


    Beteiligte:
    Tan, Wen-Hui (Autor:in) / Sun, Hong-Bao (Autor:in) / Li, Run-Jun (Autor:in)


    Erscheinungsdatum :

    2012


    Format / Umfang :

    5 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Vertical shaft one-way horsehead car operation equipment

    LI YONG / JING XIAOHAN / WANG GONGQIN et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Variation of the C~3H~2 Cyclic/Linear Form Abundance Ratio Across the Horsehead Nebula Photo-Dominated Region

    Teyssier, D. / European Space Agency | British Library Conference Proceedings | 2005


    Muck Problems in Subway Shield Tunneling in Sandy Cobble Stratum

    Cui Kai / Lin Weikang | DOAJ | 2016

    Freier Zugriff

    Subway section prefabricated part installation lifting appliance

    XING CHEN / ZHANG JIAWEI / ZHANG TONG et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Muck Problems in Subway Shield Tunneling in Sandy Cobble Stratum

    Cui, Kai / Lin, Weikang | Online Contents | 2016