The Three Gorges Ship Lift project is characterized by a long construction period, an amount of construction tenders, a plenty of construction teams, a multiplex levels of practitioners, much overhead work, a broad range of construction equipment, risky interference among construction operations, and simultaneous construction at different levels and/or sides, which come into grade cross operations and bring a great deal of difficulties to safety management. As a starting point by grade cross operations in Three Gorges Ship Lift, this research is as follows: 1. Analysis of the processes in operating unit; 2. Risk identification to the Falling Accidents, Objects Strike and Collapse in according to the standards of accident classification; 3. Assessment to rank of hazard on the basis of the result that the risk identification; 4. Put forward the effective measures which reduce hazard in reference to appraise concrete clauses involved. Finally, this paper will give a example as embedded parts and make risk assessment more scientific through comparing with calculating.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Research on Hazard Identification and Assessment of Grade Cross Operations in Three Gorges Ship Lift


    Beteiligte:
    Wang, Jian-Ping (Autor:in) / Nie, Ben-Wu (Autor:in) / Zhang, Feng-Yu (Autor:in) / Li, Zhi (Autor:in)


    Erscheinungsdatum :

    2013


    Format / Umfang :

    5 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch





    Roll-on roll-off ship suitable for scale requirement of Yangtze River three gorges ship lift

    YU YUN / YE AIJUN / LI FUJUN et al. | Europäisches Patentamt | 2021

    Freier Zugriff


    The MADM of three gorges ship gates running

    Lai, W. / Qi, H. | British Library Online Contents | 2002