To simulate the interaction between different coating holidays on buried pipeline under alternating current (AC) interference, laboratory experiments were carried out using a specially designed circuit connecting two specimens of different sizes. The area differences between holidays on the pipeline are important in accelerating corrosion with AC current, which would provoke the induced DC current between two linked specimens of different areas. The induced DC current became anodic current on smaller specimen and cathodic current on the bigger one, resulting in acceleration of corrosion rate of bigger specimen and deceleration of smaller ones. Furthermore, as the area difference became larger, the corrosion rate of smaller holiday was also higher. Upon application of AC current, corrosion potential of both two specimens shifted negatively. The induced DC current was larger with the increase in the corrosion potential difference between the two specimens in the presence of AC current. Corrosion caused by AC current includes two parts, namely the one caused by the induced DC current between two specimens and the other caused by irreversibility of anodic reaction.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    New findings on the factors accelerating AC corrosion of buried pipeline


    Weitere Titelangaben:

    Neue Erkenntnisse zu den Beschleunigungsfaktoren der Wechselstromkorrosion von unterirdischen Pipelines


    Beteiligte:
    Jiang, Zitao (Autor:in) / Du, Yanxia (Autor:in) / Lu, Minxu (Autor:in) / Zhang, Yunan (Autor:in) / Tang, Dezhi (Autor:in) / Dong, Liang (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2014


    Format / Umfang :

    10 Seiten, 14 Bilder, 35 Quellen




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Study helps model buried pipeline pitting corrosion

    Velazquez, J.C. / Valor, A. / Caleyo, F. et al. | Tema Archiv | 2009


    BURIED PIPELINE REPAIR SYSTEM

    PIRTLE JAMES | Europäisches Patentamt | 2016

    Freier Zugriff

    Buried pipeline repair system

    PIRTLE JAMES | Europäisches Patentamt | 2017

    Freier Zugriff

    Buried pipeline repair system

    PIRTLE JAMES | Europäisches Patentamt | 2016

    Freier Zugriff

    Buried pipeline construction method

    JIA LIANG / ZHANG CHUNMENG / HE YANYAN | Europäisches Patentamt | 2023

    Freier Zugriff