Traditional maintenance of door system has not taken the risk of operating failure into consideration. So a risk-based maintenance strategy is developed and applied to maintenance decision of door system. First, the EDCU unit is identified as the key subsystem of door based on the FMEA method. Then, risk assessment of the EDCU is carried out in accordance with cost. Finally, the rule of age reduction and increasing failure rate is applied to establish the model of the maintenance cycle optimization. The experiment result shows that optimal maintenance cycle of the door system is 57 days, which is verified by expert engineers.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Risk-Based Maintenance Optimization of Metro Vehicle Door System


    Beteiligte:
    Guo, Xiang (Autor:in) / Pan, Lisha (Autor:in) / Jia, Limin (Autor:in) / Zhang, Yuan (Autor:in) / Xing, Zongyi (Autor:in)


    Erscheinungsdatum :

    2014


    Format / Umfang :

    7 Seiten





    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Installation vehicle for metro shielding door

    LING REN / HUA JIABI / ZHOU YING | Europäisches Patentamt | 2021

    Freier Zugriff

    Access door protection device based on metro vehicle

    LIU JICHENG / DENG YONGGUO / ZHOU HUIHONG et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    Universal limit door for metro engineering vehicle

    SHEN ZHIJUN / ZHU HONGJUN / CHEN XING et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    Detection device for metro vehicle maintenance

    XUN SHICHANG | Europäisches Patentamt | 2022

    Freier Zugriff

    Convenient safety maintenance platform car for metro vehicle

    ZHAO QIANG / CHEN XIAOMING / ZHOU WEIQUAN et al. | Europäisches Patentamt | 2023

    Freier Zugriff