Considering the demand of night train on Beijing-Guangzhou high-speed railway, two modes of segmented rectangular maintenance time window are discussed. Methods to make train operation plans under these two modes are proposed, aiming at shortening the train waiting time and making the departure and arrival time more reasonable. Comparing the new designed train operation plans with the original one under the vertical rectangular maintenance time window, it shows that segmented rectangular maintenance time window is better in night train operation.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    The Study of Train Operation Plan of Night Train on Beijing-Guangzhou High-Speed Railway under Segmented Rectangular Maintenance Time Window



    Erschienen in:

    Erscheinungsdatum :

    16.01.2014


    Format / Umfang :

    5 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch






    Benefit Analysis of Wuhan-Guangzhou High-Speed Railway Train Operation Plan

    Gu, Jlgr Xuefei / Yan, Haifeng / Tan, Xue | TIBKAT | 2020


    Allocation Plan of Night Trains on Beijing-Guangzhou High-Speed Railway

    Sun, S. Z. / Han, B. M. / Zhang, Q. et al. | British Library Conference Proceedings | 2015


    Allocation Plan of Night Trains on Beijing-Guangzhou High-Speed Railway

    Sun, Shi Zhao ;Han, Bao Ming ;Zhang, Qi | Trans Tech Publications | 2015