Temperature of the head, the waist, the bottom and angle of the bottom of same heavy rail lying on the cooling bed is tested continuously, time interval is 5min, which can provide the basis for prebending process. Additionally, the U75V 60Kg/m heavy rail straightening processes using the horizontal and edge roll compound straightening machine is discussed in this paper, and contrasts the cross-section dimension and straightness of heavy rail before and after being straightened, which is important to make certain of optimum straightening parameters.
Straightness of U75V 100m Heavy Rail under Deferent Straightening Processes
Applied Mechanics and Materials ; 127 ; 105-109
24.10.2011
5 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Analysis on Rail Straightness and Its Straightening Technology
British Library Conference Proceedings | 2008
|Bending Deformation of U75V Heavy Rail through Natural Cooling Process
Trans Tech Publications | 2012
|Corrosion Behaviors of U75V, U76CrRE Heavy Rail Steel in Simulated Industrial Atmosphere
Trans Tech Publications | 2013
|The Deformation Rule of the Cooled U75V Heavy Rail Caused by the Different Heat Transfer Coefficient
Trans Tech Publications | 2011
|