Arch ribs in long-span, concrete-filled steel tube arch bridges are fabricated in segments and assembled on site via cable-stayed buckle-cable hoisting systems. The hoisting process involves a high risk, and monitoring systems have mainly been built to monitor the state of stress or deformation. However, instrumentation for stress monitoring, such as through-hole sensors, is expensive and has installation problems. Overreliance on instruments also leads to a disregard for the impact of environmental and construction factors on the actual state. To overcome these limitations, a cost-effective instrumentation system was developed, and a real-time monitoring program was implemented. In addition, a cable force correction method was proposed to increase the calculation accuracy by incorporating environmental and construction factors. The temperature difference is the controlling factor for the cable force; a value of 7.9°C yields a change in the cable force of 50.1 kN, which accounts for 21.1% of the total cable force. By incorporating the reverse friction at the saddles and the effect of temperature, a new correction equation for the cable force was proposed, in which the overall deviation between the measured results and the calculated results was reduced to 2%, providing a template for cable force evaluation in the engineering community.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Cable Force Correction Method for Cable-Stayed Buckle-Cable Hoisting Incorporating Environmental and Construction Factors


    Weitere Titelangaben:

    Transportation Research Record: Journal of the Transportation Research Board


    Beteiligte:
    Gao, Lei (Autor:in) / Wang, Wenquan (Autor:in) / Li, Guanghua (Autor:in) / Song, Junxi (Autor:in) / Wei, Qian (Autor:in)


    Erscheinungsdatum :

    01.01.2025




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Cable-stayed bridge deck crane for hoisting large-tonnage cable-stayed bridge steel beam and construction method

    LU GUANNAN / WU RUIHUAN / ZHANG HUAWU et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    Building material hoisting cable-stayed prevention device

    XU PENG / ZHU YING / HAN JUN et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    Hoisting method for cable-stayed bridge steel box girder

    LIU XINHUA / SHU HONGSHENG / LIU XUN et al. | Europäisches Patentamt | 2020

    Freier Zugriff

    Analysis of Identified Cable Force of Cable-Stayed Bridge

    Li, Fengchen / Zhang, Lina / Tian, Shizhu et al. | ASCE | 2009


    Cable-stayed bridge steel box girder segment hoisting equipment

    ZHANG SHIYUAN / ZOU XINGLIN / YU ZHENGHUA et al. | Europäisches Patentamt | 2024

    Freier Zugriff