Road user costs (RUC) are defined as the estimated incremental daily costs to the traveling public resulting from the construction work being performed. Those costs are primarily time lost because of conditions such as detours/rerouting that add to travel time, reduced roadway capacity that slows travel speed and increases travel time, or a delay in the opening of a new or improved facility that prevents users from gaining travel time benefits. In Texas, RUC analyses and associated liquidated damages have been applied predominantly to high-profile urban freeway reconstruction projects, which are ideal candidates for RUC application because of the potential for very high motorist delay costs. A much wider range of projects involving the addition of capacity can be considered for RUC. Not all potential projects, however, are as complicated as urban freeway reconstruction efforts that require detailed simulation modeling to determine the value of RUC. The results of a research study that developed a manual technique for determining RUC are documented, along with associated liquidated damages for typical added-capacity and highway rehabilitation projects. The technique involves a series of look-up tables that provide RUC values on the basis of project type and a minimal number of project attributes. Two different approaches were employed: a before-and-after approach for added capacity projects and a during-versus-after-construction approach for rehabilitation projects.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Estimating Road User Costs Associated with Highway Construction Projects: Simplified Method


    Weitere Titelangaben:

    Transportation Research Record: Journal of the Transportation Research Board


    Beteiligte:


    Erscheinungsdatum :

    01.01.2000




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch





    Road user and mitigation costs in highway pavement projects

    Lewis, David Leonard / National Cooperative Highway Research Program / National Research Council (U.S.) et al. | TIBKAT | 1999


    Estimating highway construction costs : program COSMOS

    Ostler, P. / Bailey, A. C. / Scott, J. P. | TIBKAT | 1979


    Simplified Earned Value Analysis Method for Highway Construction Projects

    Son, Junghye / Khwaja, Nabeel / Milligan, Duane S. et al. | Transportation Research Record | 2023