A bridge deck panel system using nonprestressed full-depth precast concrete bridge deck panels with continuous shear pockets was investigated. First, the research team performed conceptual improvement, design, detailing, and fabrication studies on a specific deck replacement system (System CD-2) previously proposed by NCHRP Project 12-65 researchers. Key improvements to the CD-2 deck panel system included modifications to the transverse joint coupler for ease of construction and the addition of a longitudinal staged-construction joint to expedite bridge deck replacement projects. Next, an experimental program was carried out to construct and perform service-level load testing on a full-size precast deck panel assemblage that incorporated the refinements. On the basis of static and cyclic loading test results, it was found that the modified CD-2 deck panel system as a whole performed satisfactorily with regard to AASHTO serviceability requirements.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Full-Scale Implementation and Testing of Full-Depth Precast Bridge Deck Panels


    Weitere Titelangaben:

    Transportation Research Record: Journal of the Transportation Research Board


    Beteiligte:


    Erscheinungsdatum :

    06.06.2019




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Rapid Bridge Deck Replacement with Full-Depth Precast Concrete Slabs

    Culmo, Michael P. | Transportation Research Record | 2000


    Strength Analysis of Precast Bridge Decks with Full-Depth Precast Overhang Panels

    Mander, Thomas J. / Mander, John B. / Head, Monique | Transportation Research Record | 2010



    Design and Construction of a Full-Width, Full-Depth Precast Concrete Deck Slab on Steel Girder Bridge

    Harrison, Alex / LeBlanc, N. David | Transportation Research Record | 2005