This paper discusses four public agency approaches to applying alternative technical concepts (ATCs) to construction manager–general contractor (CMGC) project delivery through an analysis of case study projects. The CMGC projects included a slope stabilization project in Michigan, a bridge in Oregon, the urgent, in situ foundation stabilization of a dam in Kansas, and a commuter rail project in Utah. The study results showed that ATCs provide a valuable mechanism to identify the best qualified contractor during the CMGC selection process. ATCs also permit an owner to consider innovative design solutions to constructability problems through the contractor's early involvement. The addition of ATCs to CMGC procurements permits an owner to accrue all of the savings offered by a contractor's ATCs because the contractor's preconstruction services’ contract compensates the contractor for developing the ATCs.


    Zugriff

    Download

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Applying Alternative Technical Concepts to Construction Manager–General Contractor Project Delivery


    Weitere Titelangaben:

    Transportation Research Record: Journal of the Transportation Research Board


    Beteiligte:


    Erscheinungsdatum :

    01.01.2014




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch