Features of construction methods for 366 mi of track on Florida East Coast; 50-yr life is expected; preparation of way, precise setting of ties, rail strings unloading by crane and installation of signals are described and illustrated.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    FEC's new main-track design -- Concrete ties, welded rail


    Additional title:

    Ry Track Structures


    Published in:

    Publication date :

    1966


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Main line gets welded rail on concrete ties

    Engineering Index Backfile | 1966


    Concrete ties for welded rail

    Butland, A.N. | Engineering Index Backfile | 1964


    Welded rail joints main track steam railroads

    Clarke, H.S. | Engineering Index Backfile | 1934


    Concrete ties in open track

    Engineering Index Backfile | 1926


    Renewal of bridge and trestle ties under welded rail

    Frame, R.E. | Engineering Index Backfile | 1967