Features of construction methods for 366 mi of track on Florida East Coast; 50-yr life is expected; preparation of way, precise setting of ties, rail strings unloading by crane and installation of signals are described and illustrated.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    FEC's new main-track design -- Concrete ties, welded rail


    Weitere Titelangaben:

    Ry Track Structures


    Erschienen in:

    Erscheinungsdatum :

    1966


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Main line gets welded rail on concrete ties

    Engineering Index Backfile | 1966


    Concrete ties for welded rail

    Butland, A.N. | Engineering Index Backfile | 1964


    Welded rail joints main track steam railroads

    Clarke, H.S. | Engineering Index Backfile | 1934


    Concrete ties in open track

    Engineering Index Backfile | 1926


    Renewal of bridge and trestle ties under welded rail

    Frame, R.E. | Engineering Index Backfile | 1967