Chesapeake and Ohio has installed modern signaling on Ashland Division between Big Sandy Junction, Ky, and Elkhorn City, Ky, 128.2 mi; this includes centralized traffic control on 59.3 mi of single track and 12.4 road miles of double track between Big Sandy Junction and Martin, Ky, and automatic block signaling on 42.7. mi of single track and 1.7 road miles of double track between Beaver Junction and Elkhorn City, Ky; projects described. (See also y Signaling and Communications (Formerly Ry Signaling) v 42 n 1 Jan 1949 p 36-41)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    C.T.C. increases capacity of single-Track freight line handling heavy traffic


    Additional title:

    Ry Age


    Published in:

    Railway Age ; 126 , n 8


    Publication date :

    1949


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English





    C.T.C. increases capacity of single-track

    Engineering Index Backfile | 1938


    C.T.C. increases capacity of single-track

    Engineering Index Backfile | 1938


    C.T.C. on light traffic line

    Engineering Index Backfile | 1950