British Railways are building 50 four-coach sets at Derby works, that will be used to form trains of four, eight or twelve coaches; 25-kv a-c power equipments supplied by English Electric Co Ltd provide balancing speed on level, tangent track of 68 mph (maximum service speed 75 mph); each unit consists of battery driving trailer, motor coach, nondriving trailer, and driving trailer.
Multiple-unit trains for Euston electrification
Engineer
Engineer ; 220 , n 5718
1965
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Electric trains for euston suburban services
Engineering Index Backfile | 1965
Engineering Index Backfile | 1968
The euston and watford widening
Engineering Index Backfile | 1912
Euston Remodelling: Track and signalling renewal
British Library Online Contents | 1999
The euston to watford widening
Engineering Index Backfile | 1912