British Railways are building 50 four-coach sets at Derby works, that will be used to form trains of four, eight or twelve coaches; 25-kv a-c power equipments supplied by English Electric Co Ltd provide balancing speed on level, tangent track of 68 mph (maximum service speed 75 mph); each unit consists of battery driving trailer, motor coach, nondriving trailer, and driving trailer.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Multiple-unit trains for Euston electrification


    Weitere Titelangaben:

    Engineer


    Erschienen in:

    Engineer ; 220 , n 5718


    Erscheinungsdatum :

    1965


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Electric trains for euston suburban services

    Engineering Index Backfile | 1965


    Euston station

    Engineering Index Backfile | 1968


    The euston and watford widening

    Engineering Index Backfile | 1912


    The euston to watford widening

    Engineering Index Backfile | 1912


    Euston Remodelling: Track and signalling renewal

    British Library Online Contents | 1999