Results of 16 test borings performed on the proposed subway line of the Washington Metropolitan Area Metro system in Phase II between Lafayette Park and Columbia Road are summarized in this preliminary report. It contains series of geological sections along the subway, logs of the borings, engineering laboratory test results and conclusions regarding subsoil properties. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Subsurface Investigation, Portions of Connecticut Avenue Route between Lafayette Park and Columbia Road


    Publication date :

    1966


    Size :

    161 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English