Results of 16 test borings performed on the proposed subway line of the Washington Metropolitan Area Metro system in Phase II between Lafayette Park and Columbia Road are summarized in this preliminary report. It contains series of geological sections along the subway, logs of the borings, engineering laboratory test results and conclusions regarding subsoil properties. (Author)
Subsurface Investigation, Portions of Connecticut Avenue Route between Lafayette Park and Columbia Road
1966
161 pages
Report
No indication
English
Metropolitan Rail Transportation , Transportation & Traffic Planning , Subway railways , District of Columbia , Routes , Subsurface investigations , Foundations , Rock mechanics , Soil mechanics , Tunneling(Excavation) , Subsurface structures , Boring , Subsoil , Urban transportation , Mass transportation , Urban planning , Foundation engineering , Connecticut Avenue Route
Automotive engineering | 1991
|Connecticut avenue bridge, Washington, D. C.
Engineering Index Backfile | 1905
Online Contents | 1996