Results of 16 test borings performed on the proposed subway line of the Washington Metropolitan Area Metro system in Phase II between Lafayette Park and Columbia Road are summarized in this preliminary report. It contains series of geological sections along the subway, logs of the borings, engineering laboratory test results and conclusions regarding subsoil properties. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Subsurface Investigation, Portions of Connecticut Avenue Route between Lafayette Park and Columbia Road


    Erscheinungsdatum :

    1966


    Format / Umfang :

    161 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch