Results of 23 borings performed on the proposed subway line in Phase I between Lafayette Park and Union Station of the Washington Metropolitan Area Metro system are summarized in the preliminary report. It contains a series of geological sections along the subway, logs of the borings, engineering laboratory test results and conclusions regarding subsoil properties. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Subsurface Investigations. Portions of Connecticut Avenue Route and Benning Route between Lafayette Park and Union Station


    Publication date :

    1966


    Size :

    138 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English