Results of 23 borings performed on the proposed subway line in Phase I between Lafayette Park and Union Station of the Washington Metropolitan Area Metro system are summarized in the preliminary report. It contains a series of geological sections along the subway, logs of the borings, engineering laboratory test results and conclusions regarding subsoil properties. (Author)
Subsurface Investigations. Portions of Connecticut Avenue Route and Benning Route between Lafayette Park and Union Station
1966
138 pages
Report
No indication
English
Metropolitan Rail Transportation , Transportation & Traffic Planning , Subway railways , District of Columbia , Routes , Subsurface investigations , Foundations , Rock mechanics , Soil mechanics , Tunneling(Excavation) , Subsurface structures , Boring , Subsoil , Urban transportation , Mass transportation , Urban planning , Foundation engineering , Connecticut Avenue route , Benning route
Automotive engineering | 1991
|