This study, conducted by Wilbur Smith Associates, was funded by the U.S. Trade and Development Agency. The report shows the results of a feasibility study done for the implementation of a high speed rail system linking Bangkok, the Second Bangkok International Airport and the developing cities of the Eastern Seaboard. The report contains the requirements involved in the development of the project including performance specifications, financial considerations, and guidelines for private participation. This is Volume 4 of a 4 part report. It contains the Environment Report and is divided into the following sections: Executive Summary; (1) Introduction; (2) Description of the Project; (3) Baseline Conditions; (4) Impacts from Construction; (5) Impacts from Operation; (6) Mitigation and Compensation; (7) Monitoring Program.
High Speed Rail Project: Interconnecting Bangkok and Rayong. Environmental Report
1995
162 pages
Report
No indication
English
Metropolitan Rail Transportation , Railroad Transportation , International Commerce, Marketing, & Economics , Foreign Industry Economic Development , Bangkok(Thailand) , Environmental impacts , Export trade information , Flood control , Foreign marketing , Land acquisition , Master planning , Noise pollution , Passenger transportation , Rail transportation , Rapid transit systems , Safety engineering , Thailand
Bangkok looks to rail... again
IuD Bahn | 2010
|Modern urbun rail networks for Bangkok
IuD Bahn | 2010
|