The prototype for the TFTR Neutral Beam Injection System has been assembled at the Lawrence Berkeley Laboraory, and is presently under test. Some of the construction features of the shielding enclosure, the cryogenic supply system, control and computer area, and the auxiliary vacuum and utility supply system are described. In addition, the paper describes the target chamber, its beam dump and cryopanels, and the duct that connects the target chamber to the injector vessel. (ERA citation 05:009529)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Construction of the Facility for the Testing of the TFTR Neutral Beam Injector


    Beteiligte:
    J. Haughian (Autor:in) / K. Lou (Autor:in) / D. Roth (Autor:in)

    Erscheinungsdatum :

    1979


    Format / Umfang :

    7 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    TFTR Generator Load Assessment

    F. M. Heck | NTIS | 1975


    Injector/Chamber Scaling Evaluation, Facility Checkout

    M. F. Powell / P. W. Powell / M. J. Fleiszar et al. | NTIS | 1969


    Modelling and shielding analysis of the neutral beam injector ports in ITER

    Pereslavtsev, P. / Fischer, U. / Loughlin, M. et al. | DataCite | 2014


    Simulation of a condition monitoring scheme for a neutral beam injector cryogenic pump

    Wright,N. / Dixon,R. / Ward,C. et al. | Kraftfahrwesen | 2014