The detailed data including spatial concept is not transmitted in the detailed data including the spatial concept in the statement of internal construction sites, and the integrated management of cost and process is not carried out because the construction is carried out on the site with cost-oriented details. so doing a double task of generating the necessary work breakdown structure (WBS) and spatial concept detailed data. In order to solve these problems, in this paper, the classification of information using building information model (BIM) object-based properties, 3D object creation standards, cost, and process information are presented centering on the case of highway construction sites. In the future, BIM-based cost-process integration proposes an efficient construction management practice through management.
A Case Study on BIM Object-Based Earned Value and Process Management in Highway Construction
KSCE J Civ Eng
KSCE Journal of Civil Engineering ; 26 , 2 ; 522-538
2022-02-01
17 pages
Article (Journal)
Electronic Resource
English
Simplified Earned Value Analysis Method for Highway Construction Projects
Transportation Research Record | 2023
|Earned Value Management Systems
SAE Technical Papers | 2013
Earned Value Management Systems
SAE Technical Papers | 2019
Earned Value Management Software Projects
IEEE | 2009
|Quantified Benefits of Earned Value Management
IEEE | 2023
|