The detailed data including spatial concept is not transmitted in the detailed data including the spatial concept in the statement of internal construction sites, and the integrated management of cost and process is not carried out because the construction is carried out on the site with cost-oriented details. so doing a double task of generating the necessary work breakdown structure (WBS) and spatial concept detailed data. In order to solve these problems, in this paper, the classification of information using building information model (BIM) object-based properties, 3D object creation standards, cost, and process information are presented centering on the case of highway construction sites. In the future, BIM-based cost-process integration proposes an efficient construction management practice through management.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    A Case Study on BIM Object-Based Earned Value and Process Management in Highway Construction


    Weitere Titelangaben:

    KSCE J Civ Eng


    Beteiligte:
    Kim, Yun-ok (Autor:in) / Lee, Dong-hyuk (Autor:in) / Park, Du-hee (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    01.02.2022


    Format / Umfang :

    17 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Simplified Earned Value Analysis Method for Highway Construction Projects

    Son, Junghye / Khwaja, Nabeel / Milligan, Duane S. et al. | Transportation Research Record | 2023


    Earned Value Management Systems

    SAE Technical Papers | 2013


    Earned Value Management Systems

    SAE Technical Papers | 2019


    Earned Value Management Software Projects

    Hanna, Robert A. | IEEE | 2009


    Quantified Benefits of Earned Value Management

    Jones, Matthew Evans | IEEE | 2023