In order to determine the reasonable scale of the urban road and minimize the cost of construction and the supply of urban road resources, we make use of the theory of bi-level programming to establish the reasonable road gradation model, which takes total road length, traffic supply-demand matching relationship, road capacity and road area supply as constraints. The road network of Huizhou is analyzed by using the model. The optimal solution of road grade for of main trunk road, secondary trunk road and branch road is obtained. It indicates the optimization of road network in the city and shows the urban road network optimization model is reasonable and feasible.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    The Urban Road Network Optimization Model Based on Bi-Level Programming


    Beteiligte:
    Yan, Taowei (Autor:in) / Ma, Jianxiao (Autor:in) / Lu, Tao (Autor:in) / Zhang, Haiyan (Autor:in)

    Kongress:

    11th International Conference of Chinese Transportation Professionals (ICCTP) ; 2011 ; Nanjing, China


    Erschienen in:

    ICCTP 2011 ; 740-746


    Erscheinungsdatum :

    26.07.2011




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch






    A Bi-Level Programming Model of Urban Transportation Energy Consumption Based on Road Network Capacity

    Xiang, R. / Shi, J. / Zang, X. et al. | British Library Conference Proceedings | 2009


    Bi-Level Programming Model in Road Network Programming and Its Genetic Algorithm

    Lu, Xiaoli / Xie, Xinlian / Zhou, Wanzhi et al. | ASCE | 2007


    Bi-Level Programming Model in Road Network Programming and Its Genetic Algorithm

    Lu, X. / Xie, X. / Zhou, W. et al. | British Library Conference Proceedings | 2007