Project of low-lift locks on Arkansas River provides locks 110 ft wide by 670 ft long with normal lifts ranging from 14 to 30 ft; results of tests of hydraulic system for these projects in 1 to 25-scale model are presented; 6-port and 8-port culvert intake manifolds were developed; tests of 74 sidewall port arrangements resulted in development of five port arrangements considered suitable for use at river low-life projects; analysis of data collected in low-life lock test program resulted in recommendations concerning design of sidewall port systems for 110- by 600-ft locks.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Filling and emptying systems, low-lift locks, Arkansas River project


    Weitere Titelangaben:

    U S Waterways Experiment Station -- Tech Report


    Beteiligte:
    Ables, Jr., J.H. (Autor:in) / Boyd, M.B. (Autor:in)


    Erscheinungsdatum :

    1966


    Format / Umfang :

    177 pages


    Anmerkungen:

    4 Folded tables


    Medientyp :

    Report


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Filling and Emptying System, Dardanelle Lock, Arkansas River: Hydraulic Model Investigation

    Ables, Jackson H. Jr. / Boyd, Marden B. / United States. Army. Corps of Engineers. Los Angeles District. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1969

    Freier Zugriff


    Navigation locks -- TVA's multiport lock filling and emptying system

    Elder, R.A. / Price, J.T. / Engle, W.W. | Engineering Index Backfile | 1964


    On the numerical modelling of filling-emptying system for locks

    Thorenz, Carsten / Strybny, Jann | BASE | 2012

    Freier Zugriff