Long time tests on smaller scale with system of fastening which utilizes rubber and rubber bonded cork, and with individual parts, resulted in completion of railroad viaduct in Delft, Netherlands having length of 800 m, on which two tracks have been laid without ballast and with application of new materials and techniques; construction method applied appears particularly suitable for tracks on structures for underground and suburban services.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Track without ballast on viaduct in delft


    Weitere Titelangaben:

    Int Ry Congress Assn -- Monthly Bul


    Beteiligte:
    Deenik, J.F. (Autor:in) / Eisses, J.A. (Autor:in)


    Erscheinungsdatum :

    1967


    Format / Umfang :

    19 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    New track structure for bridges without ballast

    Zaquini, G. | Engineering Index Backfile | 1959


    Track and ballast

    Rettinghouse, H. | Engineering Index Backfile | 1908



    Viaduct alterations without the use of falsework

    Edinger, F.S. | Engineering Index Backfile | 1899