Modification of permanent way of metal girder bridge on river Mella of Brescia-Iseo-Edolo railway, in service since 1884, in order to adapt it to diesel electric locomotives; wooden members replaced with U-shaped iron members anchored by means of welded sheet steel straps to longitudinal members of span; excellent operation of new structure noted.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    New track structure for bridges without ballast


    Weitere Titelangaben:

    Nuova struttura di binario per ponti senza massicciata


    Beteiligte:
    Zaquini, G. (Autor:in)

    Erschienen in:

    Ingegneria Ferroviaria ; 14 , n 7-8 ; p 677-682


    Erscheinungsdatum :

    1959


    Format / Umfang :

    6 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Italienisch


    Schlagwörter :


    Track without ballast on viaduct in delft

    Deenik, J.F. / Eisses, J.A. | Engineering Index Backfile | 1967


    Track and ballast

    Rettinghouse, H. | Engineering Index Backfile | 1908


    Modern track needs good ballast

    Cram, R.C. | Engineering Index Backfile | 1918


    Boosting ballast for better track

    Nunez, Jennifer | IuD Bahn | 2012