Data on new structures to keep port up to date; for total cost of $35,000,000, port will get three new piers to replace obsolete ones, new terminal wharf, and new concrete apron for shoreside loading; ship-loading conveyor system was increased to 30,000 bushels per hr and provision was made to load grain at five points on ship simultaneously.
Port of Boston gets face-lifting
Eng News-Rec
Engineering News-Record ; 148 , n 8
1952
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Merchandise handling gets face-lifting
Engineering Index Backfile | 1940
Engineering Index Backfile | 1946
Boston gets tough on slack carriers
Online Contents | 2001
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1936
|