Airport, at altitude of 5300 ft, can handle 200,000 passengers per year; terminal building, customs hall and control tower described; five adjoining buildings of East African Airways described; due to wind conditions, only one runway was necessary; black cotton soil, 2-3 ft thick, was removed; laval sheet below soil used as foundation; gap-graded mix used in concreting; refuelling facilities. (see also Aeroplane v 94 n 2428 Mar 14 1958 p 344-5)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Nairobi's new international airport in operation


    Weitere Titelangaben:

    Surveyor


    Erschienen in:

    Surveyor ; 117 , n 3442


    Erscheinungsdatum :

    1958


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Nairobi's new international airport in operation

    Engineering Index Backfile | 1958


    An Initial Activity-Based Travel Demand Model For Nairobi’s Paratransit

    Mwaura, Owen K. / Nnene, Obiora A. / P. Zuidgeest, Mark H. | Elsevier | 2025

    Freier Zugriff

    Measuring the Sustainable Development Goal (SDG) Transport Target and Accessibility of Nairobi’s Matatus

    Fried, Travis / Tun, Thet Hein / Klopp, Jacqueline M. et al. | Transportation Research Record | 2020