Airport, at altitude of 5300 ft, can handle 200,000 passengers per year; terminal building, customs hall and control tower described; five adjoining buildings of East African Airways described; due to wind conditions, only one runway was necessary; black cotton soil, 2-3 ft thick, was removed; laval sheet below soil used as foundation; gap-graded mix used in concreting; refuelling facilities. (see also Aeroplane v 94 n 2428 Mar 14 1958 p 344-5)
Nairobi's new international airport in operation
Surveyor
Surveyor ; 117 , n 3442
1958
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Nairobi's new international airport in operation
Engineering Index Backfile | 1958
An Initial Activity-Based Travel Demand Model For Nairobi’s Paratransit
Elsevier | 2025
|Transportation Research Record | 2020
|Brno-Turany airport - Czech airport directorate international airport
Online Contents | 1994